- Severe problems with plugging of the pump station lines that led to frequent pump rebuilds
- The system had to be interrupted 2-3 times a day to cut through rags, hair and debris
- A complete pump rebuild was needed every two years
- Three in-line 10K Muffin Monsters were installed to protect the six Penn Valley Double Disc Pumps
- The Monsters replaced the macerators that had been installed ahead of the pumps
Having installed the in-line 10K Muffin Monster has been a blessing for the last six months. Plant Maintenance Superintendent
We delivered three in-line 10K Muffin Monsters
- The grinders are compact and tough on solids in sludge applications
- They can easily grind materials macerators cannot handle
- They use less energy than macerators thus saving electrical costs
- The efficiency of the Muffin Monsters has proven so great that the plant no longer keeps all six pumps running
- The three Monsters are grinding more reliably with less energy
- There is no need to rebuild or stop sludge pumping to manually cut away the debris